Pods can save project managers and builders two to three months on their construction program.

X1 Modular developed the method of horizontal installation of a client’s pods into a recent Richard Crooks project after the usual vertical installation method became unavailable.

The company worked in the months prior to the project with the pod manufacturer at their factory for the most suitable horizontal installing method of their particular pods.

X1 Modular co-ordinated the delivery of the pods from client factory where the pods are made, to the site where they are installed by our teams.

Due to our staff’s vast, onsite, commercial plumbing experience X1 Modular are able to interconnect, commission and certify all pods.

Even though pods are tested in the factory for defects, they are also quality checked on site by our team to ensure that no defects have arisen through transition from factory to the installation process.

X1 Modular staff are also able to rectify defects on site should the occasion arise.